CAPTCHA image for SPAM prevention If you can't read the word, click here.
Maybachstra├če 11, 88094 Oberteuringen, Germany
Office hours
Monday to Thursday from 8:00 am to 4:30 pm
Friday from 8:00 am to 3:00 pm
You can contact us via e-mail or fax around the clock
Sales & Consulting
Project planning & questions about technology:
Fon: +49 7546 9248-42 E-mail
Inside Sales
Questions on current order/ delivery date:
Fon: +49 7546 9248-41
D-A-CH +49 7546 9248-21 E-mail
D-A-CH +49 7546 9248-26 E-mail
International +49 7546 9248-23 E-mail
International +49 7546 9248-22 E-mail
Handling of payments
Fon: +49 7546 9248-13 E-mail
After Sales & Support
Technical Support
Fon: +49 7546 9248-43 E-mail
Regional Office
Fon France: +33 678 478 822 E-mail
Fon Israel: +972 544 320 768 E-mail

Draco KVM solution for secure high-speed rail link to Paris

The high-speed line linking Le Mans with Rennes is one of the largest European rail projects. It adds a new high-speed train line of over 182 km to the existing line between Paris and Le Mans, putting Rennes within 1.5 hours travelling time of Paris (instead of 3.5 hours by car).

A major new control room was needed to enable train operators to manage and ensure total safety and reliability of the new line. As with all modern transportation systems, safety is a critical element, so the control room had to be operational at all times. Eiffage Energie, responsible for design, construction and maintenance, equipped the center with an extensive IHSE Draco KVM matrix switch system. All safety-relevant information is transmitted through the KVM system, which allows fast and secure access from all workstations to manage rail operations and ensure the total reliability and safety of the new rail network.

Within the control room, the operators responsible for the safe running of the line are provided with information on their local workstations, while a large videowall offers an overview of the complete rail network. In the crisis room, a video projector displays all the important information that is needed to manage potential incidents.

"The resulting installation offers a solution that is extremely simple for operators to use, whilst delivering the highest possible level of redundancy and backup in case of local component failure.  The result is a system that best ensures continuous network monitoring and allows operators to manage a safe and reliable trainline," said Adrien Trouve of Eiffage Energie.

 Read the full case study (391 KB)